Cairo East Distribution Control Center (CEDCC)
Distribution DMS Control Center at 11KV Level
# Name of the owner Cairo E.D.C
# Working with VALMET
# Start date of the project 1995
# End date of the project 1998
Scope of Work
* Site Survey
* Adaptation work design including:
o Modifying the schematic diagrams
o Generating the internal wiring & connection diagrams
o Generating the RTU connections
* Master Station Design
* Local testing and commissioning
* Overall testing and commissioning from M.S.
Description
* SCADA / DMS
* 17 S/S, 48 D.P., 200 kiosks
* No of digital and analog I/Os 10,000