Power COMPANY
The Stage II Hierarchical Dispatch Control System (HDCS) Project was for the supply of four new SCADA Systems to the Taiwan Power Company (TPC). The systems are installed in the cities of Tai-Chung, Hsin-Ying, Hsin-Chu, and Kee-Lung. The TPC power network includes 20 high-voltage substations, 45 primary substations, and 84 primary distribution substations.
No comments:
Post a Comment